Files
astro-nozzy-house-news/things.md
2024-12-08 14:28:59 +00:00

1.1 KiB

Utility

We still haven't fully installed the worktop, but we did install the tap. This removes the motivation to finish the worktop as we can now fully use the sink.

You may remember, back in ancient history when we were installing the cupboards, we mentioned that we were able to use every available centimetre on that wall. Whilst it is great for maximising storage, it also makes it difficult to get the washing machine and tumble dryer out to access the tap behind, especially when it's on a wonky tiling job. We bought a set of wheels to put the machines on, to wheel them in and out.

lounge

  • moved big mirror to other side of room
  • curtains
  • pictures on walls
  • new radiator install (bedroom too)

basement

  • curtains

dining room

  • nozzy wall hanging with interesting plasterboard fixings

hallway

  • dimmer switches (one needed big repairs)

utility

  • Installed the tap
  • washing machine wheels

bedroom

  • new curtain rail because the old one fell apart
  • new radiators

other things

  • Nikki ran the bath half in ~2 1/2 hours and raised £820 and got a massive ice cream after
  • Cool lights for Nozzy?