minor wordin changes
This commit is contained in:
40
things.md
Normal file
40
things.md
Normal file
@@ -0,0 +1,40 @@
|
||||
### Utility
|
||||
|
||||
We still haven't fully installed the worktop, but we did install the tap. This removes the motivation to finish the worktop as we can now fully use the sink.
|
||||
|
||||
You may remember, back in ancient history when we were installing the cupboards, we mentioned that we were able to use every available centimetre on that wall.
|
||||
Whilst it is great for maximising storage, it also makes it difficult to get the washing machine and tumble dryer out to access the tap behind, especially when it's on a wonky tiling job.
|
||||
We bought a set of wheels to put the machines on, to wheel them in and out.
|
||||
|
||||
## lounge
|
||||
|
||||
- moved big mirror to other side of room
|
||||
- curtains
|
||||
- pictures on walls
|
||||
- new radiator install (bedroom too)
|
||||
|
||||
## basement
|
||||
|
||||
- curtains
|
||||
|
||||
## dining room
|
||||
|
||||
- nozzy wall hanging with interesting plasterboard fixings
|
||||
|
||||
## hallway
|
||||
|
||||
- dimmer switches (one needed big repairs)
|
||||
|
||||
## utility
|
||||
|
||||
- Installed the tap
|
||||
- washing machine wheels
|
||||
|
||||
## bedroom
|
||||
|
||||
- new curtain rail because the old one fell apart
|
||||
- new radiators
|
||||
|
||||
## other things
|
||||
|
||||
- Nikki ran the bath half in ~2 1/2 hours and raised £820 and got a massive ice cream after
|
||||
Reference in New Issue
Block a user